Faversham Creek Gut Way ploughed by Medway Ports; Photo by Faversham Creek Trust

Faversham Creek Gut Way ploughed by Medway Ports; Photo by Faversham Creek Trust

Faversham Creek Trust are now motoring well in their drives to get the Creek back open and to do up the creek-side Purifier building as an apprentice training facility cum workshop. They have published this significant picture of the main gut-way of the creek (below the swing bridge) after Medway Ports engineers had dragged something called a “plough” straight down the length of it to create a straight channel down which the muddy silty stuff from the basin and swing-bridge operations could make it’s fast exit seaward without stopping at Standard Quay or Iron Wharf for a rest. They have also published pictures of the engineers down at the base of the swing bridge sluices with huge backward “Vax” hoover-style pumps stirring up the accumulated silt round the gates so that the gates could open and close. More recently I have also seen some nice pics of the Purifier windows being opened up again to let the light in, where they’d been boarded and bricked up to stop vandalism and squatters while the building was basically abandoned. All this is on the lovely Faversham Creek Trust website on http://favershamcreektrust.com/ where you can also read all the other news stories and sign up to be emailed the latest news.